Monitoring and Controlling

Monitoring and Controlling consists of those processes performed to observe project execution so that potential problems can be identified in a timely manner and corrective action can be taken, when necessary, to control the execution of the project. The key benefit is that project performance is observed and measured regularly to identify variances from the project management plan.


Monitoring and Controlling Process Group Processes.[16]Monitoring and Controlling includes:

Measuring the ongoing project activities (where we are);
Monitoring the project variables (cost, effort, ...) against the project management plan and the project performance baseline (where we should be);
Identify corrective actions to properly address issues and risks (How can we get on track again);
Influencing the factors that could circumvent integrated change control so only approved changes are implemented
In multi-phase projects, the Monitoring and Controlling process also provides feedback between project phases, in order to implement corrective or preventive actions to bring the project into compliance with the project management plan.

Project Maintenance is an ongoing process, and it includes:

Continuing support of end users
Correction of errors
Updates of the software over time

Monitoring and Controlling cycleIn this stage, auditors should pay attention to how effectively and quickly user problems are resolved.

Over the course of any construction project, the work scope changes. Change is a normal and expected part of the construction process. Changes can be the result of necessary design modifications, differing site conditions, material availability, contractor-requested changes, value engineering and impacts from third parties, to name a few. Beyond executing the change in the field, the change normally needs to be documented to show what was actually constructed. This is referred to as Change Management. Hence, the owner usually requires a final record to show all changes or, more specifically, any change that modifies the tangible portions of the finished work. The record is made on the contract documents – usually, but not necessarily limited to, the design drawings. The end product of this effort is what the industry terms as-built drawings, or more simply, “asbuilts.” The requirement for providing them is a norm in construction contracts.

When changes are introduced to the project the viability of the project has to be assessed again. It is important not to lose sight of the initial goals and targets of the projects. When the changes accumulate, the forecasted end result may not justify the proposed investment.