Monitoring and Controlling consists of those processes performed to observe project execution so that potential problems can be identified in a timely manner and corrective action can be taken, when necessary, to control the execution of the project. The key benefit is that project performance is observed and measured regularly to identify variances from the project management plan.
Monitoring and Controlling Process Group Processes.[16]Monitoring and Controlling includes:
Measuring the ongoing project activities (where we are);
Monitoring the project variables (cost, effort, ...) against the project management plan and the project performance baseline (where we should be);
Identify corrective actions to properly address issues and risks (How can we get on track again);
Influencing the factors that could circumvent integrated change control so only approved changes are implemented
In multi-phase projects, the Monitoring and Controlling process also provides feedback between project phases, in order to implement corrective or preventive actions to bring the project into compliance with the project management plan.
Project Maintenance is an ongoing process, and it includes:
Continuing support of end users
Correction of errors
Updates of the software over time
Monitoring and Controlling cycleIn this stage, auditors should pay attention to how effectively and quickly user problems are resolved.
Over the course of any construction project, the work scope changes. Change is a normal and expected part of the construction process. Changes can be the result of necessary design modifications, differing site conditions, material availability, contractor-requested changes, value engineering and impacts from third parties, to name a few. Beyond executing the change in the field, the change normally needs to be documented to show what was actually constructed. This is referred to as Change Management. Hence, the owner usually requires a final record to show all changes or, more specifically, any change that modifies the tangible portions of the finished work. The record is made on the contract documents – usually, but not necessarily limited to, the design drawings. The end product of this effort is what the industry terms as-built drawings, or more simply, “asbuilts.” The requirement for providing them is a norm in construction contracts.
When changes are introduced to the project the viability of the project has to be assessed again. It is important not to lose sight of the initial goals and targets of the projects. When the changes accumulate, the forecasted end result may not justify the proposed investment.
Wednesday, June 10, 2009
Extreme Project Management
In critical studies of Project Management, it has been noted that several of these fundamentally PERT-based models are not well suited for the multi-project company environment of today.[citation needed] Most of them are aimed at very large-scale, one-time, non-routine projects, and nowadays all kinds of management are expressed in terms of projects.
Using complex models for "projects" (or rather "tasks") spanning a few weeks has been proven to cause unnecessary costs and low maneuverability in several cases. Instead, project management experts try to identify different "lightweight" models, such as Agile Project Management methods including Extreme Programming for software development and Scrum techniques.
The generalization of Extreme Programming to other kinds of projects is extreme project management, which may be used in combination with the process modeling and management principles of human interaction management.
Using complex models for "projects" (or rather "tasks") spanning a few weeks has been proven to cause unnecessary costs and low maneuverability in several cases. Instead, project management experts try to identify different "lightweight" models, such as Agile Project Management methods including Extreme Programming for software development and Scrum techniques.
The generalization of Extreme Programming to other kinds of projects is extreme project management, which may be used in combination with the process modeling and management principles of human interaction management.
Critical Chain Project Management
Critical Chain Project Management (CCPM) is a method of planning and managing projects that puts more emphasis on the resources required to execute project tasks. It is an application of the Theory of Constraints (TOC) to projects. The goal is to increase the rate of throughput (or completion rates) of projects in an organization. Applying the first three of the five focusing steps of TOC, the system constraint for all projects is identified as resources. To exploit the constraint, tasks on the critical chain are given priority over all other activities. Finally, projects are planned and managed to ensure that the critical chain tasks are ready to start as soon as the needed resources are available, subordinating all other resources to the critical chain.
For specific projects, the project plan should undergo Resource Leveling, and the longest sequence of resource-constrained tasks is identified as the critical chain. In multi-project environments, resource leveling should be performed across projects. However, it is often enough to identify (or simply select) a single "drum" resource—a resource that acts as a constraint across projects—and stagger projects based on the availability of that single resource
For specific projects, the project plan should undergo Resource Leveling, and the longest sequence of resource-constrained tasks is identified as the critical chain. In multi-project environments, resource leveling should be performed across projects. However, it is often enough to identify (or simply select) a single "drum" resource—a resource that acts as a constraint across projects—and stagger projects based on the availability of that single resource
The traditional approach
A traditional phased approach identifies a sequence of steps to be completed. In the "traditional approach", we can distinguish 5 components of a project (4 stages plus control) in the development of a project:
Typical development phases of a projectProject initiation stage;
Project planning or design stage;
Project execution or production stage;
Project monitoring and controlling systems;
Project completion stage.
Not all the projects will visit every stage as projects can be terminated before they reach completion. Some projects don't have planning and/or monitoring stages. Some projects will go through steps 2, 3 and 4 multiple times.
Many industries utilize variations on these stages. For example, in bricks and mortar architectural design, projects typically progress through stages like Pre-Planning, Conceptual Design, Schematic Design, Design Development, Construction Drawings (or Contract Documents), and Construction Administration. In software development, this approach is often known as the waterfall model[14], i.e., one series of tasks after another in linear sequence. In software development many organizations have adapted the Rational Unified Process (RUP) to fit this methodology, although RUP does not require or explicitly recommend this practice. Waterfall development can work for small tightly defined projects, but for larger projects of undefined or unknowable scope, it is less suited. The Cone of Uncertainty explains some of this as the planning made on the initial phase of the project suffers from a high degree of uncertainty. This becomes especially true as software development is often the realization of a new or novel product, this method has been widely accepted as ineffective for software projects where requirements are largely unknowable up front and susceptible to change. While the names may differ from industry to industry, the actual stages typically follow common steps to problem solving — "defining the problem, weighing options, choosing a path, implementation and evaluation."
Typical development phases of a projectProject initiation stage;
Project planning or design stage;
Project execution or production stage;
Project monitoring and controlling systems;
Project completion stage.
Not all the projects will visit every stage as projects can be terminated before they reach completion. Some projects don't have planning and/or monitoring stages. Some projects will go through steps 2, 3 and 4 multiple times.
Many industries utilize variations on these stages. For example, in bricks and mortar architectural design, projects typically progress through stages like Pre-Planning, Conceptual Design, Schematic Design, Design Development, Construction Drawings (or Contract Documents), and Construction Administration. In software development, this approach is often known as the waterfall model[14], i.e., one series of tasks after another in linear sequence. In software development many organizations have adapted the Rational Unified Process (RUP) to fit this methodology, although RUP does not require or explicitly recommend this practice. Waterfall development can work for small tightly defined projects, but for larger projects of undefined or unknowable scope, it is less suited. The Cone of Uncertainty explains some of this as the planning made on the initial phase of the project suffers from a high degree of uncertainty. This becomes especially true as software development is often the realization of a new or novel product, this method has been widely accepted as ineffective for software projects where requirements are largely unknowable up front and susceptible to change. While the names may differ from industry to industry, the actual stages typically follow common steps to problem solving — "defining the problem, weighing options, choosing a path, implementation and evaluation."